Repair work in AMT Plant is going on
15 August 2022 0:00
Beginning from September 2019 to the present time, the repair work in ArcelorMittal Temirtau Plant is continuing. The scope includes rebricking of heating walls of Coke oven batteries Nos.3, 4 and 7 to a depth of 4-6 vertical flues and a through-wall rebuilding.
As of 15.08.2022, OKOS team has repaired 191 end flue units, and rebuilt 10 complete heating walls; 105 coking chambers have been re-commissioned and those ovens are back in scheduled operation.