FACILITY
Integrated Iron-and-Steel Works, Tangshan, Hebei province, China
TASK COMPLETED:
Hot repair of coke oven batteries №№ 1, 2 (H=5.5 m.) of by-product-coke plant:
- rebricking of heating walls throughout the whole length;
- rebricking of heating walls to the depth of 4-6 vertical flues;
- repair of reinforcing equipment;
- hot repair of refractory brickwork laying of heating walls by method of ceramic welding;
- adjustment of heating mode of coke ovens.
2009 - 2011
Hot repair of coke oven batteries №№ 1, 2 (H=5.5 m.) of by-product-coke plant:
- rebricking of heating walls throughout the whole length;
- rebricking of heating walls to the depth of 4-6 vertical flues;
- repair of reinforcing equipment;
- hot repair of refractory brickwork laying of heating walls by method of ceramic welding;
- adjustment of heating mode of coke ovens.
2009 - 2011