FACILITY
Integrated Iron-and-Steel Works, Zenica, Bosnia and Herzegovina
TASKS COMPLETED:
• Health inspection of coke oven battery No.6 of the COBP Plant
2018
• Development of engineering documentation on reconstruction, warming and start up of coke oven battery №6 of by-product-coke plant
1999 - 2000
• Restoration of work of coke oven battery №6 of by-product-coke plant and chemical recovery shops after a long shut down:
- preparatory work;
- warming up of coke oven battery with natural gas;
- charging and start-up of coke oven battery;
- start-up of chemical recovery shop;
- adjustment of machines and mechanisms' operating regime;
- adjustment of heating mode of coke ovens;
- hot repair of refractory brickwork laying of heating walls by method of ceramic welding;
- training of the personnel.
2007 - 2008
• Health inspection of coke oven battery No.6 of the COBP Plant
2018
• Development of engineering documentation on reconstruction, warming and start up of coke oven battery №6 of by-product-coke plant
1999 - 2000
• Restoration of work of coke oven battery №6 of by-product-coke plant and chemical recovery shops after a long shut down:
- preparatory work;
- warming up of coke oven battery with natural gas;
- charging and start-up of coke oven battery;
- start-up of chemical recovery shop;
- adjustment of machines and mechanisms' operating regime;
- adjustment of heating mode of coke ovens;
- hot repair of refractory brickwork laying of heating walls by method of ceramic welding;
- training of the personnel.
2007 - 2008